Is there any way to shorten the reporting interval by parameter-setting or by forcing the transmission?
The reporting interval of 12h is unacceptable for my use-case. I’m looking for a transmission every 5 min (flow and 2 temperatures at least), as this is the dynamic of the system to observe.
I’m aware of lowering the battery-lifetime by higher transmission rate!
Details:
Product model: ZEMISMART 223F
Product type: Energy Monitoring
Platform or app: Home Assistant incl. zigpy.quirk, via ZHA
For this battery-powered meter, the minimum reporting interval is 1 hour. There is no 5-minute reporting option.
The reason is that the 223F is battery powered. Reporting data too frequently would significantly increase power consumption and could cause the battery to run out much faster. We therefore recommend using a longer reporting interval to balance data freshness and battery life.
Hi Judy,
thank you for providing the new quirk. It worked right away, so I could test a 1 hour period over a couple of days.
Thank you - I really appreciate your effort!
For just energy-consumption of a house the given data are more than satisfying. But there are short-term-effects, like control-behavior of the system-pump, which call for a shorter reporting period of the primary sensor-data. And I’m pretty confident, that your measurement-system internally provides these data. The code “0” for 1 hour sadly tells me, that the current firmware doesn’t allow a faster transmission.
In the sense of your product management here are just ideas:
allow the transmission as fast as the sensor provides reasonable data (it could be used e.g. for one day and afterwards the user or an auto-fall back can go to 24 h)
implement an external powering, e.g. by USB-C (and allow fast transmission as long as external energy is available)
Best regards
PS: I’d be happy about a firmware-update (if over the air is implemented) otherwise I just can buy a MBus-device
Thank you for the feedback. We have received your suggestion and will pass the request for a wired power version to our product team. We will evaluate the market demand and consider whether to develop this version in the future.